Thursday, April 2, 2009

Lake Hartwell Dream Home - pushing for the close

I thought this was supposed to be the part where things slowed down. I cannot believe the changes since my last update. The driveway has been installed which well help to make clean up easier on the the property. The exterior colors have been locked in and the stone steps and porch have been built. The muted exterior colors blend perfectly with the stonework. The fireplace inside has been stoned from floor to ceiling. The huge master shower has been completed and the tub has been installed. The kitchen appliances are in and most of the lighting fixtures have been hung. The owners are trying to get this project closed out by the end of the month.